Bilingual backyard-casita builder · El Paso

One legal casita. Built for El Paso.

Choose a proven desert-ready plan, confirm your lot, and move from slab to handoff on a focused 30-day site calendar. Clear options in English and Spanish—without an open-ended custom remodel.

For multi-generational living, Fort Bliss moves, and more useful space at home.

Casita Sol hero

What to expect

Fewer surprises by design.

01

Code before quote

We check lot size, setbacks, coverage, owner occupancy, and current city requirements before pricing the project.

02

A menu, not a maze

Three plan sizes, coordinated finishes, and a firm scope keep decisions useful and the build repeatable.

03

The build stays visible

Milestones from slab through key handoff are documented, with updates available in English or Spanish.

Three proven plans

Pick the space your household actually needs.

Every Casita Sol plan includes a cool roof, high insulation, a mini-split, low-water landscaping, and exterior stucco and roofing selected to complement the main house.

Sol

800 sq ft

The maximum standard-lot suite: one bedroom, full daily living, and solar-ready infrastructure.

$120–140k

Best for a long-term family home, generous guest suite, or maximum legal backyard space on a qualifying standard lot.

Abuela

480 sq ft

$85–98k

An efficient studio for a parent, adult child, or UTEP student.

PCS

640 sq ft

$100–118k

A comfortable Fort Bliss guest suite with room for a longer stay.

Price bands are planning ranges, not a lot-specific quote. Site access, utilities, drainage, soil, permits, and current Development Services requirements can affect feasibility and final price. Solar is optional; custom rooflines are not offered.

Check my lot

From lot to keys

A focused path to a legal desert suite.

Productized plans reduce design drift. The process begins with feasibility—not a promise made before the property is understood.

  1. 1

    Lot check

    Share your address and goals. We screen basic lot dimensions, access, setbacks, coverage, and occupancy fit.

  2. 2

    Plan and permit

    Select Abuela, PCS, or Sol, choose from the finish menu, then finalize site documents for city review.

  3. 3

    Site calendar

    Once permits, utilities, materials, and site readiness are aligned, the 30-day on-site construction calendar begins.

  4. 4

    Handoff

    Walk the finished casita, receive the project closeout, and put the new space to work for your household.

Start with the property

Could your backyard hold a Casita Sol?

Send the address and tell us who the space is for. We’ll begin with an honest feasibility conversation in English or Spanish.

Request a lot check